The Marsh ENCO 8 Person Sewage Treatment Plant with Pumped Outlet is a dependable domestic wastewater treatment solution for properties without access to mains drainage.
Designed for domestic applications of up to 8 people, the Marsh ENCO provides effective treatment of household sewage and wastewater before the treated effluent is discharged through the pumped outlet.
The pumped outlet configuration is particularly useful where site levels, drainage layouts or the position of the final discharge point mean that a conventional gravity discharge is not suitable. The pumping arrangement provides additional flexibility when planning the treated effluent discharge from the system.
Ideal for rural properties, new-build homes, extensions, renovation projects and domestic properties without mains sewerage, the Marsh ENCO provides a practical wastewater treatment solution when correctly specified and professionally installed.
Key Features
- Suitable for domestic properties of up to 8 people
- Marsh ENCO sewage treatment plant
- Pumped outlet configuration
- Designed for domestic sewage and wastewater treatment
- Ideal for properties without mains drainage
- Suitable where gravity discharge is not practical
- Suitable for rural homes and new-build properties
- Useful for extensions and renovation projects
- Underground installation
- Provides flexibility where site levels require pumped discharge
- Designed for use as part of a professionally planned drainage system
Pumped Outlet
The pumped outlet configuration is designed for installations where the treated effluent cannot conveniently flow by gravity to the approved discharge point.
This can be particularly useful where the discharge point is at a higher level or where the site’s drainage layout makes gravity discharge unsuitable.
The correct discharge arrangement is dependent on the individual site, so customers should confirm the required configuration with their drainage contractor or installer before ordering.
Installation
Correct installation is essential for the safe and effective operation of a sewage treatment plant. Site levels, ground conditions, groundwater levels, access, electrical requirements and the proposed discharge arrangement should all be assessed before installation.
Professional installation is recommended.
Customers should confirm the suitability of the 8 Person Marsh ENCO Pumped Outlet Sewage Treatment Plant for their property before purchase and refer to the manufacturer’s technical documentation for full installation and operating requirements.
